Field Notes Nº 06, September 2026

Phantom Load

The numbers behind the data center boom don't match at any layer. The forecasts keep rising, the tax breaks outlive the equipment they bought, the chips are outrun faster than they are written off, the machines wait all day at a fifth of full power, and the bill lands on households that never signed anything. Follow one watt from the promise to the bill.

Copper: metered, measured or signed Ghost: forecast, requested or assumed Breaker: hypothetical

Electricians have a name for the power a device draws while it is switched off. They call it phantom load: the television on standby, the charger with nothing attached, pulling current for work no one can see. The American grid is now being rebuilt around a second kind. It lives in utility queues, tax statutes and investor decks. It has a megawatt figure and a target year. Some of it will become concrete and copper. Most of it, on the only evidence anyone has bothered to collect, will not. And the people paying for it cannot tell which is which, because nobody who benefits from the confusion is required to.

This note follows a single watt through five places it might live and asks one question at each stop: is this real yet? The answers are shorter than the forecasts, and cheaper for everyone except the people who end up holding them.

Thirty gigawatts of maybe

what got connected

In March 2023 the utility that serves Columbus, Ohio stopped signing up new data centers. It was not out of power. It was out of certainty. Developers had been arriving with requests the size of small cities, and the interest on AEP Ohio's books passed 30 gigawatts: more than 50 customers, more than 90 sites, every one asking for firm service and none yet obliged to take it.12 The utility could not build for all of it. It also could not tell which requests were serious, because a request cost nothing to make. Every one of them looked the same on paper.

So Ohio's regulators changed the paper. From July 2025, any data center wanting more than 25 megawatts signs a contract of up to twelve years, pays for at least 85% of what it reserves whether or not it uses it, and posts financial assurance up front.2 Then the utility watched what happened to the line.

Fig 1The line outside the door

What data centers asked for, what they studied, and what they signed. Switch to Texas to see the same shape at five times the scale.

In Ohio, about 19 of every 100 gigawatts asked for became a signed contract once signing cost money.

Funnel of gigawatts from requests to signed agreements, for Ohio and Texas
Data table for Fig 1
Queue and build figures for AEP Ohio and ERCOT
ItemGWEncoding
AEP Ohio: interest in the queue when it froze new agreements (at least)30ghost
AEP Ohio: formal load studies, 36 sites13.0ghost
AEP Ohio: signed since the tariff, Feb 20265.6copper
AEP Ohio: all data center agreements incl. pre-tariff (17,861 MW)17.9copper
ERCOT: pending large-load requests, ~90% data centers, Aug 2026474ghost
ERCOT: all-time peak demand, July 22, 202691.1copper
ERCOT: data center additions BNEF expects over the next four quarters1.2ghost
Hypothetical: 474 × 0.90 × 0.18880.2breaker
Sources: AEP Ohio's February 12, 2026 letter to Ohio regulators as reported by New Project Media1; POWER23; Utility Dive4; EIA5. Ohio's 30 GW is a floor, so its 19% signing rate is a ceiling. The Texas hypothetical is arithmetic, not a forecast.

Five and a half gigawatts signed. Thirteen went as far as a formal study. The rest, four-fifths of what had frozen a utility's planning, were never customers. They were options, written free of charge against the public's grid.1 An analyst at Enverus described the queue before the tariff without ceremony: anyone with an acre of land they thought a data center might fit on was filing an interconnection request.6

Texas has the same line, five times longer. When Governor Abbott ordered an audit of every data center in the state's connection queue this August, the requests waiting there added up to about 474 gigawatts. The whole Texas grid peaked at 91 twelve days earlier, an all-time record.45 BloombergNEF expects about one gigawatt of data centers to actually connect there over the next year.3 Switch the chart above to Texas and the signed bar nearly disappears.

Hold that ratio. Everything downstream, the forecasts, the power plants, the capacity bills, is sized against the line. And the line is free to stand in.

What was promised

what was forecast

Forecasts are supposed to narrow as the future gets closer. These have climbed, and they climbed because their inputs are the queues from section 1.

The Electric Power Research Institute said in 2024 that data centers might use up to 9% of America's electricity by 2030. In 2026 it said 9% was the floor.78 Berkeley Lab, whose December 2024 report anchored the debate, pushed its ceiling to 15% in June and, in the same document, revised the past downward: the 2024 figure came in at the bottom of the range it had projected, mainly because fewer chips shipped than the data had said.910 History came in soft. The forecast rose anyway. S&P's 451 Research raised its 2030 number by more than half in under a year.1112 And two respected shops, Goldman Sachs and 451, still disagree by a factor of two about how much power data centers drew in 2025, a year that is over.1312 They count different things in different units. Neither is lying. That is the point. A number nobody can falsify is a number nobody has to defend.

Fig 2The ratchet

Each bar is a published forecast for data centers' share of U.S. electricity, placed on the date it came out. They arrive one at a time; press play to run them again, or show them all at once. The copper line is what was actually measured.

Four forecasts in two years. The newest floor is where the oldest ceiling was.

Forecast ranges for data centers' share of U.S. electricity, rising by publication date
Data table for Fig 2
Forecast ranges by publication date
SourcePublishedTargetShare of U.S. electricity
EPRIMay 202420304.6% to 9.1%
LBNLDec 202420286.7% to 12.0%
EPRIFeb 202620309% to 17%
LBNLJun 202620309.5% to 15.3% (reference 11.8%)
LBNL, measuredJun 202620244.7%
Sources: EPRI78; LBNL910. LBNL's 2024 range targets 2028; the others target 2030. EPRI states shares of generation, LBNL of consumption.

A forecast that lives in a report can be revised. A forecast that becomes a law is harder to reach, and the clearest case is Virginia. The state wrote a sales tax exemption for data center equipment in 2008 to lure an industry; it took effect in 2010 with a sunset of 2020. In 2016 the General Assembly moved the sunset to 2035, and the statute now lets operators who meet investment and hiring thresholds push their own exemption to 2040 or 2050.1415 The industry it was written for builds server halls costing billions, and the exemption has grown with them. In fiscal 2023 the legislature's auditors put its cost at $685 million. In fiscal 2024, $1.02 billion, before the local and regional shares abated alongside it. In fiscal 2025, $1.9 billion state and local.161718 The equipment inside those halls, as the next section shows, is written off in five or six years and outrun in one or two. The tax break that bought it has a longer life than anything it buys.

Fig 3The forecast that became a law

What Virginia's data center sales tax exemption cost, by fiscal year, above how long it has been on the books.

Bars for the annual cost of Virginia's data center sales tax exemption, 685 million dollars in fiscal 2023, 1.02 billion state share in fiscal 2024, 1.9 billion state and local in fiscal 2025, above a timeline from 2010 to the 2035 sunset with extensions to 2050

Nearly tripled in two fiscal years. About $267 million of the fiscal 2024 loss would otherwise have funded K-12 schools in the counties that host the data centers.

Data table for Fig 3
Virginia data center sales tax exemption cost by year
YearCostBasis
FY 2023$685 millionJLARC via Governing, state share
FY 2024$1.02 billion state; ~$1.39 billion with local and regionalGood Jobs First; Governing reports "$1 billion"
FY 2025$1.9 billion state and localGood Jobs First, from state figures
Of which K-12 schools, FY 2024~$267 millionGood Jobs First estimate
In forceJuly 2010 to June 2035; extendable to 2040 or 2050 by MOUCode of Virginia § 58.1-609.3; SB 64 (2016); VEDP
Sources: Good Jobs First1718; JLARC as reported by Governing16; VEDP and the 2016 statute1415. The fiscal 2023 and 2024 bars are the state's share; the 2025 figure is state and local, so the bars are not strictly like for like. The exemption made up nearly 80% of Virginia's incentive spending in fiscal 2024.

Four states, Georgia, Texas, Ohio and Virginia, now lose more than $1 billion a year each to data center sales tax exemptions, and each has raised its estimate since last fall.18 The legislators who approved these were handed forecasts in the same units and with the same confidence as the ones in Fig 2. Virginia did not build a mechanism to report what its exemption cost until fiscal 2021, thirteen years after writing it.16 The incentives run to 2035 and beyond. The forecast got a statute. The statute never got a meter.

What it is worth, and for how long

how long the asset lasts against the debt on it

The watt we are following was bought to feed a chip, and the chip is the strangest asset on the grid: the most expensive thing in the building and the first thing to go out of date.

Nvidia ships a new architecture roughly every one to two years, each several times more capable than the last: Hopper in 2022, Blackwell in 2024, Rubin in 2026.19 The companies buying them by the hundred thousand have, over the same period, lengthened the accounting life of their servers. Microsoft and Google to six years. Meta to five and a half, a change it told investors would trim about $2.9 billion from its 2025 depreciation expense.1920 Amazon went the other way, shortening a class of servers to five years and citing, in its own filing, "the increased pace of technology development, particularly in the area of artificial intelligence."21 Read those two moves together. Same market, same chips, same year: one buyer says the machines last longer, another says they last less, and each is right about its own income statement. The companies say retired training chips keep earning for years on lighter work, and that is where they go. The chips that stop being frontier become the inference fleet in section 4, kept warm at a fifth of full power, waiting for a prompt.19

1to2yrs

between Nvidia architectures, as Nvidia ships them

5to6yrs

over which the owners now write the servers off

2049

when the debt on Meta's Hyperion campus matures

What is not in dispute is where the money comes from. Meta's Hyperion campus in Louisiana was financed with $27 billion of debt issued by a joint venture Meta owns one-fifth of, maturing in 2049, kept off Meta's balance sheet.22 CoreWeave borrows against the chips themselves and the customer contracts on them.22 The loan outlives the collateral by a decade or two, and the collateral outlives its own edge by a similar margin. Someone is betting the building will find tenants for chips that do not yet exist, and the bet is denominated in megawatts the grid has to honor whether or not the tenant arrives.

Meanwhile the equipment that feeds the building has gone parabolic. GE Vernova's book of gas turbine orders and slot reservations went from 83 to 116 gigawatts in six months; it is taking reservations for 2031 delivery, and its first-half 2026 orders are priced ten to twenty points above last winter's.232425 Wood Mackenzie expects turbine prices near $600 a kilowatt by 2027, close to triple 2019.26 A turbine is not a two-year purchase. It is being bought against a queue that is four-fifths bids, to feed chips whose makers outrun them every year or two, on the strength of a forecast that has already been wrong about the past.

Fig 4Written off slower than it is outrun

One AI server bought in 2026, on the schedules its owners state: what the books say it is worth, how many generations ship past it, and what it does while both clocks run.

Three strips on a 2026 to 2034 timeline: book value falling to zero over five, five and a half or six years; new chip generations arriving every one to two years; and the server working one hour in five

By 2029, when the books say the server is half used up, between one and three newer generations have shipped past it, and it has spent four hours in five waiting, drawing a fifth of its power to do it.

Data table for Fig 4
Stated terms drawn in Fig 4
ItemValueSource
Server useful life, accounting6 years (Microsoft, Google); 5.5 years (Meta); 5 years (Amazon, a subset)CNBC; Meta Q4 2024 results; Amazon 10-K
Nvidia architecture cadenceroughly 1 to 2 years (Hopper 2022, Blackwell 2024, Rubin 2026)CNBC
Inference server utilization assumed for 203020%LBNL 2025 Update
Idle draw as a share of full power20%, measuredLBNL 2025 Update, citing Brookhaven
Sources: CNBC19; Meta20; Amazon21; LBNL10. Book value is drawn straight-line, which is how the companies describe their method; the generation markers are placed at one- and two-year intervals from 2026 and are a cadence, not a product roadmap. The strip does not say what a retired chip is worth on the resale market; nobody publishes that either.

Put every clock on one line and the mismatch is the picture. The party that sets each term is the party that benefits from its length.

Fig 5The clocks

How long each piece of the bargain lasts, drawn on the same timeline, as each party states it. Hover or tap a bar for the source.

Timeline from 2026 to 2050 comparing the life of an AI chip, its depreciation schedule, a data center contract, a capacity auction commitment, a data center loan and a tax exemption that can run to 2050

Tap a bar.

Data table for Fig 5
Durations of the pieces of the data center bargain
ItemDurationSource
Nvidia architecture cadencea new generation every 1 to 2 yearsCNBC
AI server, accounting life5 to 6 yearsMicrosoft, Google, Meta, Amazon disclosures
AEP Ohio data center contractup to 12 yearsPUCO order, July 2025
PJM capacity commitment1 delivery year, bought 3 years aheadPJM auction rules
Meta Hyperion joint-venture debtto 2049credit analysis of the SPV
Virginia data center sales tax exemption2010 to 2035; extendable to 2040 or 2050Code of Virginia; SB 64 (2016); VEDP
Sources: CNBC19; SPV analysis22; POWER2; PJM27; VEDP and the 2016 statute1415. Every bar is a term stated by the party that set it.

The unevenness runs through the buildings too. The industry's average efficiency, the ratio of power into the building to power that reaches a chip, has been stuck at 1.54 for six years: 54 cents of overhead on every dollar of computing. Google runs its fleet at 1.09.2829 More than a quarter of operators work in buildings sixteen years old or older, where the upgrades that would close that gap no longer pencil out.28 The campuses with their own generation, their own cooling loops and their own engineers sit at one end of that spread. The older halls, and the communities around them, sit at the other.

The chips are outrun every year or two and written off over six. The loan runs to 2049. The tax break runs to 2035, or 2050 for those who ask. The bill outlives all of them.

What it does all day

what it does while nobody is asking

Here is the part that gave this note its title, and the reason the watt we are following is worth less than its price tag. The most careful forecast in the country, Berkeley Lab's, moves more on one assumption than on any other: not how many chips get built, but how much power they draw while they wait.

The servers that answer prompts are sized for the busiest minute of the day and spend most of the rest of it idle. The lab now assumes they will be working about one hour in five by 2030. It also assumes an idle AI server still pulls a fifth of its full power, a figure measured at Brookhaven National Laboratory. People who run these fleets told the lab it could be half, because the machines are kept warm so answers come back fast. Nobody has published field data either way.10 Nudge those two numbers and the national forecast for 2030 rises by a fifth, more than any other scenario the lab tested.10 The single largest uncertainty in American load growth is how much electricity will be spent on nothing.

1in5

hours an inference server is assumed to be working, 2030

20%

of full power it draws while waiting, measured at Brookhaven

+20.6%

swing in the 2030 national forecast from those two numbers alone

That is phantom load in the literal sense: a reservation of power held at a fifth of full draw so a machine can answer inside a second. It is also depreciating while it waits. Every idle hour is one of the fifty thousand or so in a six-year book life, spent on a chip already a generation behind. The forecast counts the reservation as demand. The balance sheet counts the chip as an asset. The meter counts the standby current. Only the meter is measuring anything.

Fig 6One chip's day

Each block is fifteen minutes of one AI server's day. Copper is work. Ghost is waiting, still drawing power. Slide to change how busy it is, then flip to see what the waiting could be worth to the grid.

Working 4.8 hours of 24. Average draw 36% of full power, and waiting supplies 44% of that.

A day of one server in fifteen-minute blocks, working versus waiting; or a year in days with the hours a flexible load would need to curtail
Data table for Fig 6
Idle and utilization parameters and flexible-load headroom
ItemValueSource
Inference server utilization assumed for 203020% (30% in the high case)LBNL 2025 Update
Idle draw as a share of rated power20% measured; 50% industry hypothesisLBNL 2025 Update, citing Brookhaven
Effect of 30%/30% on the 2030 national forecast+20.6% (649 to 782 TWh)LBNL 2025 Update, Table 2
New load the existing grid could absorb at a 0.25% curtailment rate76 GW; about 85 hours a year with some curtailment; events average 1.7 hours; half the load keeps running about 90% of that timeDuke Nicholas Institute, as reported

Average draw = full power × (working share + idle share × (1 − working share)). At 20% and 20%: 0.2 + 0.2 × 0.8 = 36% of full power.

Sources: LBNL10; Duke University's Nicholas Institute as reported by Utility Dive30, POWER31 and ACEEE32. The day view uses LBNL's formula with an operational fraction of one; the blocks are placed by a fixed pattern for legibility, not from a trace. The year view marks about 50 days with a curtailment event, the 85 hours at 1.7 hours each that Duke's 0.25% rate implies; the 76 GW leaves out transmission constraints, which its authors and critics say could reduce it.

That waiting is not only waste. It is also the most valuable thing a data center could offer a grid, if it were willing. Researchers at Duke estimated that the existing American system could absorb 76 gigawatts of new load, roughly everything the forecasts are arguing about, if that load agreed to be curtailed for a quarter of one percent of its maximum uptime: about 85 hours a year with some curtailment, in events averaging 1.7 hours, with half the load still running through most of them.3031 Flip Fig 6 to the year view and look for the copper. That is the whole ask.

The number has since been quoted in testimony and trade decks without its authors' warnings: it leaves out transmission constraints, which could erase much of the headroom, and it assumes data centers will actually deliver the flexibility they are credited with.3031 A machine that is idle four hours in five is not the same as a machine that will power down on request. The first is a fact. The second is a contract nobody has signed, and until someone signs it the flexibility is one more phantom: counted in the plan, absent from the meter.

Who pays

where the forecast becomes a line on a bill

PJM runs the grid for 67 million people across thirteen states and Washington, D.C.33 Once a year it holds an auction that pays power plants to promise they will show up on the hottest afternoon three summers from now. The price depends on how much demand PJM forecasts against how much supply appears, and every customer in the footprint pays a slice. That auction is where a queue turns into a bill.

PJM's independent market monitor has been doing the arithmetic. The forecast the July 2026 auction cleared against carried 21 gigawatts of data center load, three-quarters of it not yet on the system. The auction hit its price cap and still came up short of the reliability target.2734 The monitor's finding, across the last four auctions: data center load, actual and forecast, accounts for $29.4 billion of what the capacity market charged, 46% of the total, and the results are "almost entirely the result of large load additions from data centers."3534 Its proposal is to make data centers buy their own capacity in a separate auction. PJM has agreed about the cause, if not yet the cure.35

Fig 7The bill

Top: four years of PJM capacity charges, with the share its market monitor attributes to data center load. Bottom: what the same monthly increase means to households at different incomes.

Bar of 63.6 billion dollars in PJM capacity charges across four auctions, with 29.4 billion attributed to data center load

An extra $10 a month is 0.2% of a $60,000 income. For a household already spending 20% of its income on energy, that is the same dollars on top of a burden nearly seven times heavier.

Energy burden bars: typical 3 percent, low-income up to 20 percent, with the chosen increase added to each
Data table for Fig 7
PJM capacity charges and household energy burden
ItemValueSource
PJM capacity charges, four auctions 2025/26 to 2028/29$63.6 billionIMM (29.4 ÷ 0.462)
Attributed by the IMM to data center load$29.4 billion (46.2%)IMM presentation, July 2026
Data center load in the 2028/29 forecast; of which above embedded (not yet on the system)21,470 MW; 16,436 MWIMM presentation, July 2026
Crude per-person share, 67 million people, four delivery yearsabout $440, or $110 a yearcopper.vision arithmetic
Energy burden, higher-income householdsabout 3% of incomeEESI
Energy burden, low-income, renter, Black and Hispanic householdsup to 20% of incomeEESI
U.S. households behind on utility bills entering 2026about 1 in 6NEADA via Consumer Reports
Sources: PJM's market monitor3534; PJM2733; EESI36; Consumer Reports37. The monitor's dollars are counterfactuals, what the auctions would have produced with a smaller forecast, and PJM notes that customers hedged through their own supply do not pay the clearing price. The per-person share divides the attributed total by population; it is a scale, not a bill. The income slider is generic: it shows how a flat increase lands, not a PJM-derived amount.

The dollars in Fig 7 are careful counterfactuals, not invoices, and hedged customers escape some of them. The direction is not in dispute. And a flat charge is not flat. Low-income, renter, Black and Hispanic households spend up to a fifth of their income on energy, against about 3% for higher-income households; one American household in six entered this year behind on its utility bill.3637 Nearly half of the country's data centers sit in census tracts that already carry above-median environmental burdens.38 Slide the income in Fig 7 down and watch the same ten dollars change meaning.

The incentive ledgerwho asks · who guesses · who promises · who pays
The developer
asks

Files for several times what it will build, because a request is free and a place in line is worth money. Until Ohio put a price on the reservation, the cost of asking was zero.

pays: nothing, until it signs

The forecaster
guesses

Utilities and PJM feed the queue into the load forecast. If the forecast runs high, the plants get built and the cost passes through in rates. The error is never charged back to whoever made it.

pays: nothing; recovers it

The legislature
promises

Writes a 25-year exemption for an asset its owners write off in six and replace in two, then installs the meter for what it costs thirteen years later.

pays: $1.9 billion a year, foregone

The household
pays

Signed nothing. Carries the capacity charge for load that is three-quarters forecast, on a bill that already takes up to a fifth of income at the bottom of the ladder.

pays: the reservation, plus the error

There is a version of this that bills the reservation to whoever asked for it. Ohio's tariff does that at the utility: sign for up to twelve years, pay for at least 85% of what you reserve. PJM's monitor wants the same logic in the capacity market. Until one of them reaches the auction, the forecast is charged to everyone, and the party who guessed high never sees the invoice.

Three rules

what to do with a number you cannot verify

Follow the watt back up the page. It was asked for five times over, by parties who paid nothing to ask. It was forecast in units nobody shares, by parties who pay nothing when the forecast is wrong. It was subsidized by a tax break written before the industry it now serves existed, set to run a decade past the equipment it buys and, for operators who file the paperwork, a quarter century. It spends four hours in five waiting inside a chip that will be outrun before the loan on the building is a tenth of the way to maturity. And it shows up on bills that fall hardest on the people least able to pay, none of whom were in the room.

None of the people producing these numbers is lying. The forecasts, the queues, the exemption ledgers and the depreciation schedules each answer a different question, and they all wear the same units. The damage begins when a bid is read as a plan, a projection as a price, or a standby machine as demand. Every mismatch on this page runs the same direction: the cost of being wrong lands on someone other than the person who guessed. Three rules would stop most of it.

Twenty-four of Ohio's thirty gigawatts were never coming. Everything built to serve them was real. So is the bill.

Method and limits

Scope. Figures are as published by each source and were re-read on September 29, 2026. The page keeps to numbers that are measured, signed or stated by the party responsible for them; the fuller reconciliation, with every number and its unit, is in the claim ledger published alongside this note. Claims that could not be verified at a primary source, including consumer power-quality effects and the earliest cost projection for Virginia's exemption, were cut and are listed in the ledger.

Conversions. The Fig 1 hypothetical multiplies Texas's 474 GW queue by 0.90 and by Ohio's 5,642 ÷ 30,000 signing rate; Ohio's 30 GW is a floor, so the rate is a ceiling. Fig 4 draws book value straight-line over the stated useful lives and places generation markers at one- and two-year intervals from 2026. Fig 6 applies LBNL's average-power formula with an operational fraction of one, and draws Duke's 0.25% curtailment rate as the roughly 85 hours a year, in events averaging 1.7 hours, that Duke's authors report; an earlier draft of this note rendered the rate as 22 hours, which is 0.25% of a year and not what the study says. Fig 7 divides the monitor's $29.4 billion by 67 million people; the income slider is generic and shows how a flat increase lands, not a PJM-derived amount. None of these is a result of the institution named.

Secondhand figures. JLARC's yearly figures are via Governing; AEP Ohio's figures via New Project Media; the Texas queue and BNEF figures via Utility Dive and POWER; the Nvidia cadence and the Microsoft and Google useful lives via CNBC, whose page could not be re-fetched for this pass; Duke's estimate via Utility Dive, POWER and ACEEE; the Hyperion structure via a published credit analysis; the turbine pricing via trade press reporting an earnings call. Meta's and Amazon's useful-life changes were read in their own SEC filings. Everything else is read at the source.

Caveats carried on the page. Duke's 76 GW leaves out transmission constraints and reserve margins, which pull in opposite directions. The monitor's dollars are counterfactuals, not settled charges. Fig 3's fiscal 2025 bar is state and local while the earlier bars are state only. PJM's own documents give its population as 65 million (territory page) and 67 million (July 2026 release); the page uses the release.

Encoding. Copper marks a metered, measured or signed quantity. Ghost marks a forecast, request or stated assumption. Breaker, dotted red, marks a hypothetical; on this page it appears only in Fig 1. Color is never the only carrier; hatching, dots and hollow outlines repeat the distinction, and every chart has a data table.

Facts re-read September 29, 2026. Corrections: none as of publication; corrections will be listed here with dates. Report an error through the contact route on the copper.vision homepage.

References

  1. New Project Media, "AEP Ohio touts 'right-sized load' as data center pipeline shrinks further under new tariff," reporting AEP Ohio's February 12, 2026 letter to the Public Utilities Commission of Ohio. newprojectmedia.com
  2. POWER Magazine, "Regulator Approves AEP Ohio's Landmark Data Center Tariff," July 2025. powermag.com
  3. POWER Magazine, "Texas Audit Could Delay 49.8 GW of Data Center Load, Cost Projects Up to $15 Billion, BNEF Warns," August 6, 2026. powermag.com
  4. Utility Dive, "Facing an estimated 474 GW of interconnection requests, Texas hits pause on data centers," August 5, 2026. utilitydive.com
  5. U.S. Energy Information Administration, "Hourly peak load in ERCOT set a new record, exceeding 91 GW on July 22," August 3, 2026. eia.gov
  6. Utility Dive, "Large load tariffs could streamline interconnection by shrinking queues: Enverus," quoting Enverus analyst Adam Robinson. utilitydive.com
  7. EPRI, "EPRI Study: Data Centers Could Consume up to 9% of U.S. Electricity Generation by 2030," May 29, 2024. epri.com
  8. EPRI, "EPRI: Data Centers Could Consume Up to 17% of U.S. Electricity by 2030," February 26, 2026. globenewswire.com
  9. Lawrence Berkeley National Laboratory, Shehabi et al., 2024 United States Data Center Energy Usage Report, LBNL-2001637, December 2024. eta-publications.lbl.gov
  10. Lawrence Berkeley National Laboratory, Smith et al., United States Data Center Energy Usage Report: 2025 Update, LBNL-2001758, June 2026. escholarship.org
  11. S&P Global Commodity Insights, "Data center grid-power demand to rise 22% in 2025, nearly triple by 2030," October 14, 2025. spglobal.com
  12. S&P Global Energy Horizons, "Surging US data center power demand tests sustainability targets," May 2026. spglobal.com
  13. Goldman Sachs Research, "US Data Center Power Demand Projected to Double by 2027," May 20, 2026. goldmansachs.com
  14. Virginia Economic Development Partnership, "Data Center Retail Sales and Use Tax Exemption," available July 1, 2010 through June 30, 2035, with extensions to 2040 and 2050 for operators that sign a memorandum of understanding and meet investment and job thresholds. vedp.org
  15. Virginia General Assembly, SB 64 (2016), Chapter 712, extending the exemption's sunset from June 30, 2020 to June 30, 2035. legiscan.com
  16. Governing, "Virginia's Data Center Tax Breaks Cost the State $1 Billion," reporting JLARC, November 26, 2025. governing.com
  17. Good Jobs First, The Hidden Costs of Virginia's Data Center Subsidy and How They Undermine Public Schools, April 2026. goodjobsfirst.org
  18. Good Jobs First, "Even Cloudier with a Greater Loss of Spending Control: How Data Center Tax Abatements Undermine Public Budgets," June 2026. goodjobsfirst.org
  19. CNBC, "The question everyone in AI is asking: How long before a GPU depreciates?", November 14, 2025. cnbc.com
  20. Meta Platforms, "Meta Reports Fourth Quarter and Full Year 2024 Results," Exhibit 99.1 to Form 8-K, January 29, 2025: useful life of certain servers and network assets raised to 5.5 years, expected to reduce 2025 depreciation by approximately $2.9 billion. sec.gov
  21. Amazon.com, Form 10-K for the year ended December 31, 2024, Note 1: useful lives of a subset of servers and networking equipment changed from six years to five, effective January 1, 2025. sec.gov
  22. Sascha Steffen (Frankfurt School of Finance), "Who bears the risk in Nvidia's $500 billion financing platform?", August 14, 2026, with terms of the Meta Hyperion and CoreWeave facilities. sascha-steffen.de
  23. GE Vernova, first quarter 2026 results, Form 8-K, April 22, 2026: gas equipment backlog and slot reservations grew from 83 to 100 GW. sec.gov
  24. GE Vernova, second quarter 2026 results, Form 8-K, July 22, 2026: 100 to 116 GW; at least 125 GW anticipated by year-end. sec.gov
  25. Utility Dive, "GE Vernova gas turbine backlog climbs to 116 GW," July 2026, including reservations for 2031 delivery. utilitydive.com
  26. Power Engineering, "Data centers drive record surge in GE Vernova power equipment orders as turbine slots tighten through 2030," April 2026, citing Wood Mackenzie. power-eng.com
  27. PJM Interconnection, 2028/2029 Base Residual Auction Report, July 14, 2026. pjm.com
  28. Uptime Institute, Global Data Center Survey 2025. uptimeinstitute.com
  29. Google, "Efficiency: Data Centers," fleet PUE 1.09 for 2025. datacenters.google
  30. Utility Dive, "Existing US grid can handle 'significant' new flexible load: report," reporting Norris et al., Rethinking Load Growth, Duke Nicholas Institute, February 2025: 76 to 126 GW at 0.25% to 1% curtailment; 85, 177 and 366 hours a year; transmission not considered. utilitydive.com
  31. POWER Magazine, "Duke Researchers: Grid Flexibility Key to Accommodate Load Growth," February 19, 2025: 76 / 98 / 126 GW; average event 1.7 / 2.1 / 2.5 hours; about half the load retained about 90% of curtailment time. powermag.com
  32. ACEEE, "Data Center Efficiency and Load Flexibility Can Reduce Power Grid Strain and Costs," October 7, 2025. aceee.org
  33. PJM Interconnection, "PJM Capacity Auction Procures 138,318 MW of Generation Resources," news release, July 14, 2026: 67 million people across 13 states and the District of Columbia. pjm.com
  34. Monitoring Analytics, "Market Monitor Report," presentation to the PJM Members Committee, July 27, 2026. pjm.com
  35. Monitoring Analytics, Independent Market Monitor for PJM, Analysis of the 2027/2028 RPM Base Residual Auction, Part A, January 5, 2026. monitoringanalytics.com
  36. Environmental and Energy Study Institute, "Data Center Power Demands Are Contributing to Higher Energy Bills," 2026. eesi.org
  37. Consumer Reports, "Inside the Energy Affordability Crisis," July 23, 2026, citing NEADA. consumerreports.org
  38. World Resources Institute, "From Energy Use to Air Quality, the Many Ways Data Centers Affect US Communities," February 17, 2026. wri.org